Expert silicone roof coating in Grafton, OH. Licensed spray foam contractors with manufacturer-backed warranties and free inspections.
Lapolla Industries applies high-solids silicone coatings over existing metal, TPO, EPDM, and SPF roofs in Grafton. A single application seals every seam, reflects up to 85 percent of solar radiation, and adds 15 to 20 years of warranted waterproof protection to your existing roof.
The buildings and homes of Grafton, OH face unique challenges — from seasonal temperature extremes to storm exposure — that demand roofing and insulation systems built for performance, not just price. Lapolla Industries delivers silicone roof coating solutions using closed-cell spray polyurethane foam that outperforms conventional materials in every measurable category.
Our Grafton customers see the difference in their energy bills, their comfort levels, and the longevity of their roofing systems. Spray foam does not degrade like fiberglass, does not develop seam failures like TPO, and does not crack like built-up roofing. It is a permanent solution — and Lapolla Industries is the permanent partner Grafton property owners rely on to deliver it right.
How our certified crews deliver precision silicone roof coating in Grafton, OH.
Every project begins with a thorough inspection of your property. We evaluate the existing condition, identify problem areas, and use infrared moisture scanning when needed to reveal hidden issues. You receive a detailed report with photos and honest recommendations.
Our preparation process includes substrate inspection, cleaning, moisture testing, and priming. We mask all areas not receiving foam, set up containment where needed, and verify that temperature and humidity conditions are within specification for application.
Using precision spray equipment, our crews apply the foam in controlled passes to achieve the specified thickness and density. The closed-cell foam expands 30 to 40 times its liquid volume, conforming to every detail of the surface and creating a seamless monolithic barrier.
After the foam cures, we apply a UV-protective coating — silicone, acrylic, or elastomeric — selected for your specific application and climate. We then remove all masking, clean up the work area, and conduct a final walkthrough with you to verify satisfaction.
Expert answers to frequently asked silicone roof coating questions.
Costs for silicone roof coating in Grafton vary based on project size, existing conditions, and material requirements. We provide free on-site estimates with detailed written proposals. Contact us at {phone} for a no-obligation quote.
Yes. Every silicone roof coating project in Grafton is backed by manufacturer material warranties plus our own workmanship guarantee. We handle all warranty registration and remain available for warranty service throughout the life of your system.
Yes. Spray foam can be applied year-round in Grafton as long as surface temperatures are above 40 degrees Fahrenheit. Our crews monitor substrate temperature and ambient conditions to ensure proper foam curing and adhesion regardless of season.
Absolutely. Once cured, spray polyurethane foam is inert and non-toxic. Our Grafton crews follow all OSHA safety protocols during application, including full PPE and ventilation procedures. The foam cures within minutes and is safe immediately after.
Our reputation is built on results. Here is what our customers have to say.
"The silicone coating they applied to our metal roof eliminated all the rust spots and sealed every seam and fastener. The reflective finish dropped our cooling costs noticeably. Our building looks ten years newer."
"Lapolla Industries installed a spray foam roof on our warehouse last spring. Their crew was thorough, professional, and finished ahead of schedule. The building stays cooler in summer and the roof looks pristine a year later."
"Our commercial building needed a roof solution that would not require tenant relocation. The restoration approach was perfect — no tear-off noise or debris, minimal odor, and a fully warranted system installed in under two weeks."